I'm looking at buying Studiometry for my architectural practice where I work on projects in stages - eg. Concept Design, Design Development, Documentation etc. Fees for each of these stages are set out in an estimate at the start of the project. I then invoice on a "percentage complete" basis - that is, I send out an invoice at the end of each month for the work done in each stage up to the date of the invoice. So in the first invoice, Concept Design might be 90% complete and Design Development 20% complete.
Is there a simple way in Studiometry to invoice on this basis and relate it back to the estimate? So when I go to invoice the next month, I know how much was invoiced in each stage the month before?