When editing a To-Do, you can select the "Attached" Project at the top. This opens a window that lets you search for project (etc.) to assign. Is there a way to add a check box to include non-live jobs (maybe default to unchecked for speed)?
Date
Votes
1 comment
-
Mike Meiners I might also add the ability to edit "Attached To" settings in the "Group Edit" feature (under "Search").
Both of these request come from a discovery that I have dozens of "un-attached" To-Dos". I'm not sure where these are coming from. A lot of them are older jobs.
Please sign in to leave a comment.