0

Next Step in ToDo

It would be really good if in the ToDo window if there was a tick box next to the "Next Step" text box that became selectable when their is text in the Next Step textbox. The tickbox would say "Create ToDo on Completion" and what it would do is when the current ToDo is completed then it would automatically create a new ToDo item with the Subject set to the new text in the Next Step field. 

In the preferences it would also be possible to set the ToDo type for the Next Step item and the Due Date eg 7 days.

It would also be good if there was a Next Step field with the above features in the Log screen so that when a Log event is completed then it automatically creates a new ToDo item.

This helps to make Studiometry more compatible with the Getting Things Done process management system.

0 comments

Please sign in to leave a comment.